Barclays Capital London, UK

Barclays Capital occupy some 100,000 sq.m across two buildings at Canary Wharf and the Delmatic proprietary-protocol systems were upgraded to latest Lon open-protocol systems through the insertion of plug-in upgrade cards.
 
The upgrade involved no changes to the original installation and the systems provide presence detector and daylight-linked control across all floors as well as sophisticated demand-response load-shedding of both lighting and power.   Open protocol integration with the BMS HVAC controllers has enabled air-conditioning to be linked to occupation via the Delmatic presence detectors.